Rehau manifold installation
Adjust if required as above. If not press twice to continue. Scroll through and press on Pro. The 5 possible sequences below can be scrolled through and selected by 4.
Page 52 5. Page 53 7. The first is 24 hour clock and temperature in celsius. Turning on Adaptive function ensures that the room will reach the correct temperature at the desired time. Using these settings, the secondary heat source could be turned on if the room does not reach the correct temperature in the desired time. Page Two Stage Room Temperature Controller When a timed event occurs to raise the room temperature a function within the controller allows the normal heating system to initially try to The Two Stage Controller is installed as part of the BA achieve the temperature.
If after a period of time x it has not warmed controller and set to a channel number, e. Page Special Functions 1 slave to string 2 submaster or string 1 slave to string 2 slave as shown in Fig. Page Dip Switches The position of these sensors should be Page Checking Control System Operation Sensor check: a. Switch on DIP-3 to activate sensor check - power light starts blinking.
Output relay for Main pump, Cooling, Incorrect connection to device output relay has volt free contacts, see BA Master Controller wiring diagram for correct connection. High limit valve or other attached Bad electrical connection between terminals and attached device. Page 63 Supply Limit sensor may be subject to heat migration. Room is too cold.
If more than one error occurs, they will be prioritised in the sequence of flashes. Replace the faulty sensor. Reset is NOT required. If a CT2 Programmable Room Controller operating a group of Room Sensors becomes defective, the remaining Room Sensors will continue control within the maximum and minimum limits programmed into the Master Controller. Depending on the system configuration the control will continue in one of the following ways. Page 69 Working conditions and use under conditions for which the product was not intended and over which we have no influence exclude any claim resulting from our information.
We recommend that a suitable check is made as to whether the REHAU product is suitable for the envisaged purpose. Application, use and processing of the products is carried out beyond the scope of our control and are therefore carried out exclusively at your own responsibility.
Print page 1 Print document 69 pages. Rename the bookmark. Delete bookmark? This is a general overview of how the product is installed and does not replace the need for a proper design and installation guides.
Things like clearing the joists of nails, checking joist penetration requirements and knowing the surface flooring materials are key, and are not covered in our general overview. A minimum gap of 1"" must be kept between panels. It is important to keep a 6"" gap from the end of the joist bay and the pipe. With one end of the first loop connected to the manifold, you start feeding pipe into the joist space as illustrated below. The last step is to install pipe protection sleeves on the pipe to prevent rubbing as the pipe expands and contracts from the hot water in the radiant pipe.
The flow meter is easy to read and can be cleaned during ongoing operation. Fitters can conveniently mount the manifold in the manifold cabinet by clicking it into place. Expansion sets for an additional heating circuit and an extensive range of installation accessories complete the range. The polymer heat meter assembly set was introduced in April and has now been followed in January by the flex P controller set, available either with a thermostatic head or with actuator.
0コメント